Sample portfolio / Anonymized quantities / Pricing omitted
THE WORK, IN DETAIL
Good estimates
leave a clear trail.
Inspect the scope behind the schedule. Explore real workbook quantities, material categories and drawing references through a clearer view of the estimating process.
THE TAKEOFF INDEX
MEASURED. ORGANIZED. TRACEABLE.04sample workspaces
Selected line items204
PresentationQuantities only
01 / SELECT A SCOPE
A closer look at the deliverable.
Selected excerpts from supplied estimating workbooks.
Anonymized excerpts, without client or outcome claims.
02 / INSPECT THE TAKEOFF
Coordinated MEP takeoff
Plumbing, HVAC and electrical quantities from one coordinated estimating workbook.
SAMPLE MEP-01
SELECTED EXCERPT
| Material / assembly | Base quantity | Unit |
|---|---|---|
2" Vent PipePiping · CSI 22 00 00
| 129.29 | LF |
3" Vent PipePiping · CSI 22 00 00
| 60.81 | LF |
4" Vent PipePiping · CSI 22 00 00
| 22.3 | LF |
2" Sanitary PipePiping · CSI 22 00 00
| 54.4 | LF |
3" Sanitary PipePiping · CSI 22 00 00
| 20.89 | LF |
SCO Stack Cleanout Jay R Smith #4510S(Y)Plumbing Fixtures · CSI 22 00 00
| 2 | EA |
LV1 Lavatory (ADA Accessible) Kohler #K-20000-0 "Caxton" White Viterous ChinaPlumbing Fixtures · CSI 22 00 00
| 1 | EA |
1–7 of 60 selected items
1 / 9
Quantities are read from the supplied workbook’s saved values. This presentation does not recalculate the estimate, disclose commercial pricing or claim a completed client engagement.
03 / DEFINE YOUR NEXT SCOPEYour drawings.
Your drawings.
A clear estimating brief.
Share the trade, drawing set and bid requirements. Confirm the quantities, pricing basis and deliverables in your project quote.