CSI MasterFormat Scope Reference
How to organize project quantity schedules using the project specification divisions and sections.
Use the project specification as the source
MasterFormat is a classification system for organizing construction information. Use the divisions and section identifiers in the issued project manual. This page is a workflow reference, not a reproduction of the full classification standard or a promise that one division defines a subcontract.
Build a scope register
| Register field | What to record | | --- | --- | | Specification identifier | Division and section exactly as issued | | Drawing references | Sheets and details supporting the quantity | | Item description | Material, system, size and assembly limits | | Quantity and unit | Measurement basis and deduction convention | | Scope owner | Trade responsible for supply and installation | | Pricing basis | Quote source, date and included work | | Clarification | Missing details, conflicts and pending decisions |
Check boundaries across sections
A utility run can involve pipe, structures, excavation, bedding and surface restoration. A section classification alone does not allocate every item. Reconcile civil and building connections, equipment supply and installation, temporary work and owner-furnished items against the bid documents.
Review the CSI divisions guide for related discussion. Confirm the current classification and project requirements before issuing a schedule. Document addenda that change specifications or trade boundaries.